| Sign In | Join Free | My entremaqueros.com |
|
Brand Name : ZHENHENG
Model Number : Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Certification : SGS, ISO, BV, CE
Place of Origin : HENAN CHINA
MOQ : 1 set
Price : Negotiation
Payment Terms : L/C, D/A, D/P, T/T
Supply Ability : 30 sets per month
Delivery Time : 7-15 working days after confirm order
Packaging Details : Export standard container: 20GP or 40GP, 40HC
After-sales service provided : Engineers available to service machinery overseas
Product name : Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Power Type : 3phase,50hz,38v
Max. Aggregate : 80/60mm
Warranty : twelve month
Machine Type : Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Color : Customer Required
Application : Building Works
Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Product Description of Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer
Principles of Mobile Concrete Batching Plant:
Mobile concrete batching plant is consist of aggregate loading system, electric auto-measurement system. The core of the whole system is the auto-measurement controlled by computer, which will operate the feeding quantity of cement, sand, gravel, keep the mixture ratio of concrete strictly, to ensure the production quality.
The system works by high-tech of mechanical and electrical integration, establish the auto-running of electronic weighing and feeding trolley and chain procedures. It will also effective organized the generally used machinery in the construction enterprises, such as the concrete mixer, engineering vehicles, belt conveyors, etc, play their best performance.
Technical Parameters of JZM500 Construction Equipment Capacity 25m3/H Drum Mobile Concrete Batching Plant
| No. | Modle | YHZM20 |
| / | Theory Capacity | 20m³/h |
| Loading Suggestion | 40HC*2 | |
| Total Power | 42kw | |
| Total Weight | 12T | |
| 1 | Aggregate System | |
| Modle | PLD800-2Bins | |
| Storage Vloume | 4m³*2 | |
| Weighing Hopper | 800L | |
| Motor Power | 4kw*2 | |
| 2 | Mixing System | |
| Modle | JZM500 | |
| Charging Volume | 800L | |
| Discharging Volume | 500L | |
| Theory Capacity | 20 m³/h | |
| Mixing Motor Power | 4.5kw*2 | |
| Water Pump Power | 0.75kw | |
| Discharging Height | 1100mm | |
| 3 | Measurement System | |
| Cement Weighing System | Yes | |
| Water Weighing System | Yes | |
| Additive Weighing System | Yes | |
| 4 | Pneumatic System | |
| Air Compressor | 0.36m³ | |
| 5 | Control System | |
| Aotomatic Control Cabinet | Yes | |
| 6 | Screw Conveyor | LSY219*6M*7.5kw |
| 7 | Cement Silo | 50T*1 |
The main features of JZM500 Construction Equipment Capacity 25m3/H Drum Mobile Concrete Batching Plant:
A: The overall layout
Modular design,easy to disassemble.
B:structure characteristics
Unique water supply lines, automatic water supply system, reduced water time and increased production efficiency by 20 %
C:Traction mode
Trailer traction, easy to move and walk.
D: Control System
One-button start mode, simple operation, stable and reliable performance.

a. Tires: Double tires, strong pressure bearing capacity, strong stability, non-slip.
b. Support leg: Quick disassemble and assembly, stabilize machine during work, protect tires, and extend service life.
c. Universal Steering wheel: can be dragged by a medium-sized forklift directly, ensure the direction changing stably.
d. Storage hopper base: moved from the middle to the front generating two advantages:
a). remaining space can be used for the generator, control cabinet, water tank, tool box, etc.;
b). shorten the length of the feeding belt and the feeding time, thereby shortening the single mixing cycle by 10s, and improving the working efficiency.
e. Support steel: Increase the bearing capacity of the chassis and extend the service life.
Compact structure: Movable completely, work on the supporting legs, No foundation needed.
![]() | Concrete Drum |
| Aggregate Batching Machine | ![]() |
![]() | Water, Cement and Additive Scales |
Certifications:
Since ZHENHENG has been established, we have paid the great attention to improvement our quality. In recent years, we have made breakthroughs in market access and qualification certification, provided equipment to consumers with excellent product quality.

Q: Can we visit your factory?
A: Yes. You can visit our factory at anytime you want.
Q: Can you put our logo on the machine?
A: Yes,it is available.LOGO and color are usually as per customer's requirement.
Q: What’s the warranty time?
A: From the date of shipment, 1 year or 1500working hours, whichever comes first.
Q: What’s your payment term?
A: We accept T/T(30% down payment and balance before shipping) and L/C mostly, but if you prefer other payment terms please contact us for further information.
Q: How long is your delivery time?
A: Usually, it is 7-10 workdays if the goods are in stock, or it is 15-20 working days if the goods are not in stock, it is according to quantity.
More photos of JZM500 Construction Equipment Capacity 25m3/H Drum Mobile Concrete Batching Plant



|
|
Work Method Statement Erection Of YHZM20 Mobile Concrete Mixer Images |